Hi,
my board has long needed some serious thought put into it so i can utilize it seriously for some strength/steepness training. due to the height of my garage it had no option but to be a set up with two 1220 x 2440 plywood boards landscape with another board cutinto a triangle so it can fit into the apex of the roof. The angle is 55 degrees.
Now i have quite a few juggy resin hold plus a set of HIT strips. but im wanting to set it up in a similar situation one of those beastmaker 50degree boards like they have at rockover in manchester and other such walls. probably be keen to put larger footholds initially. but i was wondering if anyone had any pictures or plans of how to get started in positioning the holds as im a bit at a loss as to where to start in terms of doing it correctly. i'll be making/buying some wood for the setup.
i thought if people do things similar to sticking the holds on with an adhesive whilst they are designing it and then screw them in once it looks like they have it correct? as i could im agine totally wrecking the board if i just start screwing the holds on and moving them around infinately until they make some kind of sense?
Cheers
Tim