i think that big hold on the slab is out.
this is of course assuming we're not talking the Bridestones here!
Slopey ledge to top has been done, but i don't think the low start has been added.
Will consult Farrar and find out the facts. However he is pretty lank. Doesn't the bank rise steeply to the left allowing a reach across?
Spoke to Kim at weekend, they started off the boulder a' la the Joker, no name/grade offered. Had a look on Sunday, the crack start looks a fine project, would have given it a go but holds were all wet. Also spied another fine project in the area so will be back there soon for a play.
do u mean the 7c/7c+ ballpark or the 6c/7a ballpark :? :wink:
It's all Swiss to me.
QuoteIt's all Swiss to me.wot u mean 98% manufactured?