Update on this now I'm in the process of dismantling it.
The two extension pieces didn't come off clean and are headed for the tip.
The campus board needs a few inches lopping of the bottom but above that is fine.
The main boards are still up but look fine, no splitting or delayering to worry about, feel perfectly solid. T nuts all good rust free. Supporting wood and kick board also good.
Holds:
Bolt ons, 113 pictured, all in good nick, mix of bleaustone, holdz, entreprise, rockworks and others. There's a few more that are slightly broken but useable in with the freebies. Good mix of hold types.
https://photos.app.goo.gl/77Ht4V1UYHLyJSBL9Screw ons.
https://photos.app.goo.gl/aCBqFsdfsMagCQGRARungs and crimps as previously listed.
https://photos.app.goo.gl/3rGqN6k6wyGP2hbr9Freebies: slap seconds, homemade wooden holds and blob footholds. The slap holds needed the bolt hole drilling out a bit, they look a bit untidy but function perfectly well as holds. Around 30 wooden holds from 10mm crimps to XL campus rungs.
https://photos.app.goo.gl/f4hMbXqyampNSCNo8Hardware, 100+ bolts mostly 35, 50 and 60mm but a few longer ones. Loads of screws and quite a few more to come.
https://photos.app.goo.gl/WTeqpK7Y8HFr8ksc6Thinking £150 would be more fair, again charging for the good holds and rungs and bundling in the seconds, homemade holds, boards and hardware.