I can'y quite imagine what that looks like..?
Why the confusion?
I've seen a couple of overlaping vids. It starts on the Ace jug, goes left along the seam, down to that shield, up to a smile-shaped thing, to the arete, rocks round, traverses the slab to finish up the left arete of the slab. All in a straight sorta line. It looks amazing.
Not sure exactly what Dawid's done here.I heard he was working a problem starting in the cave and traversing into the dyno Full House.
Looking at the Stanage guide the “Joker Wall Project” is described as the “futuristic line going along the horizontal crack then punching it out for the top” (where Full House now goes)
Also, it is amazing how utterly piss they both make Full House look.