any progress here? last time i was there they'd deconstructed those little rooms and there was some poor sole whittling some wood.
I was also told Johnny Brown of this parish is doing the constructing (or had a least been over to have a look/quote so he might be the chap to ask).
Quote from: galpinos on September 25, 2009, 08:02:52 amI was also told Johnny Brown of this parish is doing the constructing (or had a least been over to have a look/quote so he might be the chap to ask).?You mean andy, not adam
I'm sure you probably all know this but there is a 45 degree board at Broughton. It may not be perfect but the wall is pretty much self regulated so if anyone wanted to make improvements to it I doubt there'd be anything to stop them.
45 degree woodie.
There you go
Rumour was that painting (shame) and setting will have begun on monday.
No. There was foam ready to be covered off to the side though, so it looks to have arrived. Dont know if you would paint it above mats anyway would you?
Quote from: dobbin on October 28, 2009, 08:42:08 amNo. There was foam ready to be covered off to the side though, so it looks to have arrived. Dont know if you would paint it above mats anyway would you? Good point. Apparently, the word on the street is it'll be half fixed holds/training board and half problems. Can't wait.